3.50.6
Release Date: August 25, 2023
Store Manager
-
Improved landed cost calculations
Starting with release 3.50.6, if you have selected Use landed cost when receiving merchandise (and have selected a Default Cost Distribution Method of either Quantity or Value), Store Manager uses improved calculations to calculate the landed cost for each item received through purchase orders and inventory transfers.
Refer to Setting up inventory rules or more information about setting up landed cost. Refer to Calculating landed cost for more information about the calculations used for landed cost.
Use the RMH Landed Cost Plus Cost Update Method Worksheet to check your landed cost for specific items. This worksheet is available for download from the PDF Guides section of the RMH online help.
Central Manager
-
Control how often the Backwards Compatibility Extension checks for jobs
Starting with release 3.50.6, you can configure how often the Backwards Compatibility Extension checks for jobs in the database. The minimum interval is 10 seconds and the maximum is 60 seconds. Configure the job processing interval to optimize Central Server performance.
To access this configuration option, open RMH Central Server, click Extensions, and click Config.